We were brought into this project post demo by the homeowner.
It's not a large master bath so it was very important to take as much advantage of the space available as possible.

Here is the before picture taken by the homeowner prior to his demolition of the bathroom.

Door on the left is a 24" into the bathroom By removing the wall and framing for a pocket door we were able to make the door opening larger. It was necessary to move the electrical box that houses fan and light switches to the opposite
wall but it worked quite well.

With all electrical work and rough-in plumbing completed, time for tile work...

All cabinetry and fixtures are now installed. Pocket door is installed and all trimwork is complete as well.

Standing in shower area, here is a picture of the new bathroom completed using an ultra wide-angle lens.

Well, here it is. A look at the final results of this master bath remodel project with the shower door installed. |